About Complex | Technical Condition

b3.gif (80,1kb)

All buildings (built in 1971) were comprehensively reconstructed from 2005 to 2008 and all communications and engineering systems were modernized and replaced.

    Modern engineering systems and technologies:
  • central air conditioning system (chiller fan coil);
  • heating and water heating provided by MOEK (provider of heat), standalone water heating system using electric boilers;
  • water supply and sewerage system provided by Mosvodokanal (provider of water), standalone water supply facility (water well);
  • fire system;
  • power supply provided by Mosenergo (provider of electricity); provided power supply - 2,300 kVA;
  • ventilation system;
  • communications: optical fiber, automatic telephone station (ATS) for 2,500 numbers; internal ATS for administration for 48 numbers; providers: MGTS and Makomnet
    European standards fit-out:
  • ceilings: suspended, plasterboard; in office rooms - Armstrong type with built-in downlights;
  • windows: VIDNAL SPL 'warm' aluminum profile, 2-chamber panels with tinted Arctic Blue color glass, tilt-and-turn, Roto (Germany) hardware;
  • floor in entrance hall: ceramic granite;
  • floors in office rooms: parquet, laminated, carpet, linoleum.

Structure of the building: precast concrete building.
Elevators are by KONE (Finland), world's leading corporation for complex innovative solutions, design, installation, maintenance and modernization of elevators and escalators. Number of elevators - 3.

icon6.gif (8,21kb)
mozhaika.ru Website | Navigation Guide | © HM 1996-2010 - Corporate Information